Game |
Achievement |
Points |
Unlocked |
|
|
Earthrise |
2.00 | 01/02/2016 20:12:21 |
Isn't it beautiful? |
|
|
Lemming Party |
1.57 | 12/26/2015 13:48:09 |
Throw a "lemming" party. |
|
|
Subversive Engineering |
1.61 | 12/26/2015 13:26:31 |
Solve any puzzle in over 10,000 cycles. |
|
|
Workshop Master (Level 1) |
1.85 | 12/26/2015 13:04:22 |
Solve 5 puzzles from Steam Workshop. |
|
|
Power Couple |
1.39 | 12/13/2015 12:12:02 |
Solve "Shuttle Propulsion Units" with a solution that contains only two welders. |
|
|
Save the Whales |
1.46 | 12/13/2015 12:09:34 |
Save a "whale" from an unfortunate end. |
|
|
Optimization (Cargo Uplifter) |
1.56 | 12/13/2015 12:07:12 |
Solve "Cargo Uplifter" in 140 cycles or less. |
|
|
Optimization (Gneiss Chair) |
1.54 | 12/13/2015 01:35:37 |
Solve "Gneiss Chair" in 225 cycles or less. |
|
|
Optimization (Aerial Combat Shuttle) |
1.71 | 12/12/2015 13:16:45 |
Solve "Aerial Combat Shuttle" in 320 cycles or less. |
|
|
Optimization (Terrestrial Drone) |
1.65 | 12/12/2015 11:58:57 |
Solve "Terrestrial Drone" with a footprint of 300 or less. |
|
|
Optimization (Anti-javelin Point Defense) |
1.55 | 12/09/2015 02:37:02 |
Solve "Anti-javelin Point Defense" with a footprint of 255 or less. |
|
|
Optimization (Furnished Studio Apartment) |
1.45 | 12/06/2015 18:20:44 |
Solve "Furnished Studio Apartment" in 130 cycles or less. |
|
|
Optimization (Oversight Terminal Model 6) |
1.39 | 12/06/2015 16:04:30 |
Solve "Oversight Terminal Model 6" with a footprint of 95 or less. |
|
|
Optimization (Small Excavator) |
1.44 | 12/06/2015 13:14:35 |
Solve "Small Excavator" with a footprint of 135 or less. |
|
|
Optimization (Guided Javelin Type 1) |
1.23 | 12/06/2015 11:03:57 |
Solve "Guided Javelin Type 1" in 210 cycles or less. |
|
|
Optimization (Wave Detection Array) |
1.14 | 12/06/2015 10:41:10 |
Solve "Wave Detection Array" with a footprint of 100 or less. |
|
|
Flat-pack Factory |
0.85 | 12/06/2015 10:30:15 |
Solve "Training Routine 1" with a solution that is only one block tall. |
|
|
Optimization (Training Routine 5) |
1.08 | 12/05/2015 14:37:28 |
Solve "Training Routine 5" in 85 cycles or less. |
|
|
Optimization (Training Routine 1) |
0.95 | 12/05/2015 13:50:26 |
Solve "Training Routine 1" with a footprint of 50 or less. |
|
|
Job Security |
0.53 | 12/05/2015 13:47:49 |
You will never be let go. |